Bridge construction in the sensitive rainforest in Brazil.

  • For the construction of the 82 km long highway “Rodovia dos Tamoios”, leading from Caraguatatuba to Sao Paulo, LCS was commissioned with the construction of a bridge over a gorge with up to 100 m depth. With the help of a 20 ton cable crane system the two pillars of the bridge were assembled and construction material such as concrete and construction equipment were transported. Due to the difficult access to the construction site, the 45 m high tower had to be installed by helicopter (Aéro-spatiale AS 332 – Super Puma).

    By using a cable crane system easy access to the construction site could be guaranteed and the environmental impact was reduced to a minimum. Furthermore, the system could be used for limited manpower transportation.

Customer

Construtora Queiroz Galvão S.A

Project owner

Concessionária Rodovia Dos Tamoios S.A.

Location

Brazil

Year

2018 – 2020

Total length

500 m

Slope

n/a

Height difference

up to 100 m

Payload

20 to

Loads

concrete, construction material and equipment