France
Construction site in the middle of the city of Paris
LCS winches and crane units in action for a construction site in the middle of the city of Paris.
LCS supplied two electro-hydraulic winches, two crane units with a payload of 20 to and various components for the removal of construction material. Mecamont Hydro installed two independent systems with two transport boxes each, which transported the excavated material to a ship on the Seine. The construction site in the middle of the city was located next to an apartment building, resulting in operating hours from Monday to Friday from 08:00 to 18:00. As the construction site was difficult to access by truck due to heavy traffic, cable crane systems were installed, which were driven by electro-hydraulic winches to keep the noise level as low as possible.