First cable crane system operating in Canada for the construction of a hydro power plant.
The Bear Creek Hydro Project was the first project of LCS in Canada where safety and environmental regulations were very high. The cable crane system installed in British Columbia as part of the construction of the hydro power plant Bear Creek was approved according to the BCSA regulations to transport personnel with a gondola to the construction site. During the construction LCS was responsible for the transport of pipes and personnel with the 16 to cable crane system.