North Fork Siphon Replacement Project

First cable crane system by LCS for the dismantling and renewal of a penstock in the USA.

  • LCS supplied a 20 to cable crane system for the dismantling and renewal of a penstock running through a mountainous valley in the USA. The system was initially installed on one site of the mountain in the middle of the valley. After completion of this section, the system was dismantled and re-installed on the other side – parallel to the first section. The system transported pipes and construction material such as concrete and soil for filling the trenches.

    The system met all safety guidelines, which are quite strict in America. Due to years of experience and know-how, an LCS cable crane system was applied for this project.

Customer

Whitaker Construction Co.

Project owner

CUWCD

Location

USA

Year

2019 – 2020

Total length

700 m (each side)

Slope

up to 25°

Height difference

250 m

Payload

20 to

Loads

pipes, construction material

Pipe diameter

100"